OLTC Overhauling Saudi Arabia

OLTC Overhauling Saudi Arabia has become one of the most important services for ensuring reliable power supply across the Kingdom. Power transformers used in National Grid SA carry heavy electrical loads every day, and their health directly affects the stability of the entire network.

Our company delivers professional RCM (Reliability Centered Maintenance) and Preventive Maintenance (PM) services for 67MVA power transformers, focusing on OLTC overhauling and transformer oil leakage repair. These services help National Grid Saudi Arabia reduce failures, avoid shutdowns, and increase transformer lifespan.

What is OLTC and Why Overhauling is Important?

An On-Load Tap Changer (OLTC) is a device inside a transformer that adjusts voltage levels while the transformer is still running. It helps keep electricity stable even when demand changes.

Common OLTC Failure Signs

     

      • Burning smell or carbon contamination

      • Overheating or unusual noise

      • Slow tap-changing movement

      • High contact wear

      • Oil contamination due to arcing

    Why Overhauling Matters

    If the OLTC fails, the transformer can shut down immediately, causing power outages. Overhauling ensures:

       

        • Smooth tap-changing

        • Reduced arcing

        • Lower risk of internal damage

        • Longer transformer life

      This is why National Grid Saudi Arabia requires strict OLTC maintenance standards across all major substations.

      Scope of Work – 67MVA Transformer Overhauling

      Our team followed complete RCM and PM workflows while servicing the 67MVA power transformer for National Grid SA.

      OLTC Disassembly & Inspection

      We fully opened the OLTC chamber, removed switching components, inspected for carbon deposits, overheating, oil contamination, and worn contacts.

      Contact Replacement

      Worn and burnt contacts reduce performance. We replaced:

         

          • Fixed contacts

          • Moving contacts

          • Reversing switch contacts

        This ensures smooth and fast switching.

        Mechanical Cleaning

        All parts were cleaned to remove sludge, carbon, and moisture. This improves oil performance and reduces chances of internal faults.

        Switching Mechanism Calibration

        We calibrated:

           

            • Tap positions

            • Motor drive

            • Reversing mechanism

            • Selector switches

          This ensures the OLTC changes taps accurately and safely under load.

          Transformer Leakage Repair (Oil Leakage)

          Transformer oil leakage is common in older or heavily loaded units. Oil must remain inside the transformer to cool and insulate internal components.

          Types of Oil Leakages

             

              • Gasket leak

              • Radiator or cooler pipe leak

              • Bushing flange leak

              • Valve leak

              • Tank welding crack

            Causes of Leakage

               

                • Gasket ageing

                • Vibration

                • Corrosion

                • High temperature

                • Improper sealing

              Complete Leakage Repair Steps

                 

                  • Identify the leakage source

                  • Drain and prepare the repair area

                  • Replace damaged gaskets

                  • Seal the cracked area

                  • Tighten all bolts with torque setting

                  • Perform oil top-up

                  • Check pressure and vacuum sealing

                This guarantees zero leakage after testing.

                RCM (Reliability Centered Maintenance) Approach

                National Grid Saudi Arabia uses RCM to reduce faults and increase transformer availability.

                Why RCM is Important

                   

                    • Increases system reliability

                    • Reduces unplanned shutdowns

                    • Extends OLTC and transformer lifespan

                    • Improves safety

                    • Ensures continuous electricity supply

                  Using RCM, we analyze OLTC failure causes, load cycles, and environmental conditions to plan the best maintenance actions.

                   

                  Preventive Maintenance (PM) Activities Performed

                  To meet maintenance standards in Saudi Arabia, our PM activities include:

                  DGA Testing (Dissolved Gas Analysis)

                  Detects faults inside oil like arcing, overheating, or insulation breakdown.

                  IR Thermography

                  Identifies hotspots on bushings, connections, and OLTC.

                  OLTC Timing Test

                  Checks switching speed and mechanical movement.

                  Oil Filtration & Dehydration

                  Removes:

                     

                      • Moisture

                      • Acidity

                      • Sludge

                      • Gas bubbles

                    Bolts Tightening & Torqueing

                    Ensures all flanges, valves, and radiators stay leak-free.

                    These PM tasks ensure the transformer stays in excellent operating condition.

                    Testing & Commissioning After Overhaul

                    After completing overhauling and leakage repair, our engineers perform:

                    Functional Testing

                       

                        • Manual tap changing

                        • Motor drive operation

                        • Selector mechanism test

                      Load Testing

                      Checks OLTC performance under real power load.

                      Final Inspection Checklist

                         

                          • Oil level and pressure

                          • No leakage

                          • Proper temperature

                          • Correct tap position

                          • Clean contacts

                          • Healthy insulation

                        Only after passing all tests, the transformer is returned safely to operation.

                        FAQs

                        1) What is an On-Load Tap Changer (OLTC) and why does it need overhauling?

                        An On-Load Tap Changer (OLTC) is a critical transformer component that regulates voltage under load conditions. Over time, OLTC contacts and oil degrade due to arcing and continuous operation, making overhauling necessary to maintain grid stability, reduce failures, and increase transformer lifespan.

                        2)How often should a 67MVA power transformer OLTC be serviced in Saudi Arabia?

                        For National Grid Saudi Arabia–level installations, OLTC inspection is recommended every 3–5 years, while major overhauling should be performed every 6–8 years, depending on operational load, environmental conditions, and oil test results.

                        3)What is included in the OLTC overhauling process?

                        Typical OLTC overhauling includes:

                           

                            • Mechanical checks and reassembly

                            • Disassembly and cleaning

                            • Replacement of carbon contacts

                            • Inspection of selector and diverter switches

                            • Oil filtration or oil replacement

                            • Electrical testing (TTR, IR, BDV,Contact Resistance)

                          4) What causes oil leakage in power transformers?

                          Oil leakage usually occurs due to:

                             

                              • Aged gaskets and seals

                              • Faulty flange joints

                              • Thermal expansion

                              • Worn bushings or conservator tank seals

                            Improper previous maintenance

                            5)Why is OLTC and leakage repair important for National Grid Saudi Arabia?

                            Reliable transformers ensure stable power distribution, reduced downtime, and operational safety. Overhauling and repairing a 67MVA transformer prevents unplanned outages and complies with Saudi National Grid operational standards.

                            6)How long does transformer OLTC overhauling usually take?

                            A complete OLTC overhauling and leakage repair for a 67MVA transformer typically takes 1 day, depending on damage, spare part availability, and testing requirements.

                            7)Do you provide OLTC overhauling and leakage repair services across Saudi Arabia?

                            Yes, services are available across Riyadh, Dammam, Jeddah, Makkah, Madinah, Tabuk, Abha, and all regions in Saudi Arabia.

                            8)How do you ensure quality and compliance during transformer maintenance?

                            We follow IEC standards, National Grid Saudi Arabia maintenance guidelines, and complete all repairs with certified engineers, calibrated tools, and documented test reports.

                            Final Results & Benefits for National Grid Saudi Arabia

                            After completing the OLTC overhauling and leakage repair, the 67MVA transformer showed significant improvements:

                             Zero oil leakage
                             Smooth and fast OLTC switching
                             Stable transformer temperature
                             Improved voltage regulation
                             Reduced risk of sudden shutdowns
                             Increased reliability of the power network
                             Extended asset lifespan

                            Thanks to our RCM + PM approach, the transformer is now performing at optimum capacity, supporting National Grid SA operations reliably.